15.03.2020

automatic machine translation

$100000

Factory

561

Ukraine

Verkhn'odniprovs'k

In progress

up to 1 year

Placement of production equipment in my production areas.

Industries

Production

Goals

Investment

Partnership

Project summary

The plant located at the address: Dnepropetrovsk region, Verkhnedneprovsk st. Titova 202 on a regular rectangular land plot with an area of 18,000.0 sq.m. 1.8 hectares State Act 49 years. The total area of the premises of the complex is 4292.5 sq. M. The territory of the complex is fenced with a reinforced concrete fence and has 2 entrance gates;
There is an asphalt area in front of the main building with an area of 1680 sq. M., As well as a road and sidewalks providing access to the rest of the buildings.
The territory of the complex has its own transformer substation of 400 kW, all the necessary utilities are supplied, gas, water, sewage.
Possible RENT or joint implementation of the project with the investor: construction of a solar Photo-Electro Station (FES), Granary (elevator), organization of any production.
Bonuses upon purchase: 1. Another 24 years the validity period of the State act on land with payment of 25,000-27,000 thousand per year. 2. Water storage 150 cubic meters concrete. 3. Own transformer substation 400 kW with an equipped metering unit. 4. Gas on the territory of the hydraulic fracturing plant behind the fence 5. Water meter. 6. Sewerage.
7. Paved area and roads around the building. 8. Weight. 9. Emission chimney 50 meters high.
10. Shop with an area of 150 meters.
11. Concrete fence around the perimeter.
12. Renovated roof on the building. 13. Near the elevator.

Meeting place

All messages
All messages

Find project