03.10.2020
$3000000
Production of green hydrogen in Ukraine
350
Ukraine
Kyiv
In progress
more than 3 years
Production in Ukraine of green hydrogen by water electrolysis and its subsequent export to Western Europe.
Project summary
Production in Ukraine of green hydrogen by water electrolysis and its subsequent export to Western Europe. The energy for the electrolysis process is supplied by a solar power plant. "Green" hydrogen is in maximum demand in European countries, especially in Germany and the Netherlands. Key advantages of the project: ❑ Optimal climate for solar energy in the southern regions of Ukraine: high - more than 1500 kWh / m2 - insolation and relatively. ❑ Excess power plant capacity in Ukraine, including solar and wind power plants. With an installed capacity of 55 GW, only 17 GW is consumed. ❑ A plot of land with an area of 70 hectares, 30 km from Kherson. ❑ Favorable transport position: the distance from the land plot in the Kherson region to the nearest port is 2.5 km. Another transport option is by road. Distance to Berlin - 1800 km.
Concept of the project Key advantages of the project: ❑ Ukraine is listed separately as a priority partner in the “Hydrogen Strategy adopted by the European Commission on July 8, 2020 ❑ Scaling the project from an initial capacity of 5 MW to 40 MW and above. ❑ Professional team with vast experience and expertise ❑ Additional options for project development: - supply of "green" hydrogen to the domestic market of Ukraine - creation of a network of hydrogen filling stations for cars in Ukraine - production of autonomous energy stations using solar panels and hydrogen for residential complexes and industrial facilities Financial indicators: ❑ Required investments - Euro 9.99M. 70% can be attracted as a bank loan ❑ Start of hydrogen production from the moment of receiving financing - 8-10 months ❑ IRR of the project (10 years)> 23%, IRR (20 years)> 27% Financing interest rate - 5% ❑ Free cash flow (20 years) - Euro 23.4M