03.08.2021

$35000

Eco-House for the price of an apartment

331

Ukraine

Rivne

In progress

up to 1 year

Own production and high-speed construction of eco-friendly housing using wall sandwich blocks using Teplosten technology. Advantages: low price of finished M2 and speed of wall installation (5-7 days).

Industries

Raw Material Production

Real estate

Production

Social

Building

Goals

Investment

Partnership

Project summary

The return on investment will be made within 1-1.5 seasons due to the construction and sale of housing (M2) at competitive prices (at or below market prices).

The received investment funds will be used for the reactivation and launch of production, marketing, preparation and application for grant financing for a number of programs for the construction of social housing, and more.

The assets already have a complete line of special equipment and a full package of technical documentation for the manufacture of 22 products, legal entity (now TOV. If necessary, reorganization into AOZT is possible).

The total capacity of the production line allows the production of material sufficient for the construction of 3 one and a half storey cottages or one townhouse (for 4-6 apartments) per month. These production volumes can be easily increased by 2-3 times if necessary.

Detailed product information can be found here: https://drive.google.com/file/d/1VP_s0pE3H7BCd-zUbL-0F-GQy0MbdLRT/view?usp=sharing

Overview videos on the benefits of this technology:
https://www.youtube.com/watch?v=4dZT8T_Vb1g
https://www.youtube.com/watch?v=hqwWIZKVg-w

The current location is the city of Rivne (if necessary, relocation is possible)

The enterprise is currently being mothballed. No activity in progress.

 

Meeting place

All messages
All messages

Find project