13.05.2020

automatic machine translation

$250000

AD PIPE

548

Ukraine

Kyiv

In progress

up to 1 year

Production of endless pipes of any diameter with any wall thickness without electric welding and hot processes

Industries

Equipment

Production

Transport / Logistics

Goals

Partnership

Roles

Finance

Project summary

 

A preliminary analysis of raw materials and materials for the manufacture of "continuous pipes" has been carried out.

A preliminary analysis of the possibility of obtaining patents for the "Method" and "Devices" that implement it is carried out.

PROBLEM OR OPPORTUNITY

The world demand for pipe products of large (over 300 mm) diameters is millions of kilometers per year.
As a rule, pipes of large diameters are made in one place and stacked in another.

Transportation accounts for a significant share in the pricing of pipe products. Due to the exhaustion of the capabilities of vehicles in terms of only one indicator - "loading by vehicle volume", transport is used "in full", but, extremely unprofitable.

SHEN P E IU

This Project will create an opportunity to manufacture pipe products for multipurpose purposes - pressure and non-pressure for transportation:

gaseous and liquid products incl. and hydrocarbon raw materials, including for transportation of dust-air mixtures and pulp;

- waters for various purposes, incl. and drinking standards;

- aggressive liquids and mixtures;

- heat carriers (heating mains, etc.);

One of the most important factors in the implementation of this Project will be the possibility of producing pipes at the place of their use (installation and laying). Thus , at the Second Stage of the Project development, a “Mobile Production Complex” for pipe production will be developed.
The third stage of the Project development is the creation of the Global Transport Logistics Network GLOBAL TRANSPORT LOGISTICS NETWORK ( GTLN ).
The project developing in the Third Phase will become a worldwide network of new logistic connections for both raw materials or products and passenger flows of new modes of transport.

In order to save water resources, it becomes possible to implement the "River in the Pipe" Project.

F AND NANS S

Per vy   E- tap approximately: $ 100 - 250 thousand;

Phase Two estimated: $ 1.5 million;

Stage Three estimated: $ 5 million

The sale of licenses for the reproduction of PPK, after the end of the Second Stage, will yield a profit of approximately $ 200 million (the number of limited licenses is no more than 100, the cost is not less than $ 2 million).

Meeting place

All messages
All messages

Looking for a partner

automatic machine translation

Finance

1) Fund the work, acting as an organizational and financial Partner. 2) Organize, after the signing of this Agreement, by agreement of the Parties, functioning project and / or workplaces, to attract, on the recommendation of Party-1, specialists and / or organizers of directions at the place of the Project implementation; 3) Organize contacts and facilitate the activities of the Parties aimed at establishing business ties in the general field of activity to improve the possibilities for the implementation of the Project in any territories that are recognized by the Parties as promising (including payment of travel expenses, daily expenses, organization of travel and flights and payment of tickets for cars -avia-w / d)

Expected abilities

I am looking for an Organizational and Financial Partner with participation in 100% financing of all costs. I look forward to partner development of the Project up to the stage of selling licenses for the reproduction of "Walking complexes for the production of pipes". I offer a parity share in the Project

Find project